Grid-Side BESS for AI Campuses: Ride-Through and Load Smoothing

Our post on Batteries for AI Data Centres: BBU vs UPS looked at the battery that sits in the rack. This post looks at the other end of the supply: the point where a campus of several hundred megawatts meets the transmission network. Grid operators now expect these sites to stay connected through ordinary faults and to stop passing fast load swings back onto the grid. Batteries are one of the main ways to meet both expectations, but the duty is unlike arbitrage, frequency response or a classic UPS. Here we cover what went wrong, what the new rules ask for, the hardware options, a quick sizing check, and what the duty means for the cells.

Grid BESS AI campus schematic
Where a grid-side battery sits at an AI campus, and its two jobs: riding through grid voltage dips and smoothing fast training-load swings. The rack end is covered in the BBU vs UPS post. Our sketch; the traces are illustrative, not measured data.

The problem: load that disappears

The case everyone now cites happened on 22 July 2026. A mechanical failure took out a 230 kV line in Northern Virginia. Protection cleared the fault normally, but data centres in the Dominion zone saw the voltage dip and moved themselves onto backup generation. PJM reports a first drop of 2,970 MW and a second wave of 1,099 MW, about 3,800 MW in total, although the same article also describes it as nearly 4,000 MW [1]. Dominion had already seen smaller events of around 1,500 MW in July 2024 and February 2025 [1]. Sandia’s review for ERCOT counts 26 events in Texas between 2023 and 2025 where large loads tripped on routine voltage disturbances [2].

The mechanism is simple. A facility UPS or transfer scheme is designed to protect the servers, so a short sag looks like a reason to leave the grid. One site doing this is a nuisance. Gigawatts doing it at once is a sudden loss of load, which pushes frequency up and voltage around in the same way as losing a large generator in reverse.

What the rules now ask for

ERCOT was first. NOGRR282 sets frequency and voltage ride-through requirements for Large Computational Loads. The ERCOT Board recommended it on 2 June 2026, the Texas PUC approved it on 9 July 2026 and it took effect on 1 August 2026 [3]. Older facilities can be exempt if they meet the attestation or energisation deadlines in the rule. The frequency bands below are from Section 2.6.4 of the Nodal Operating Guide [4]. The voltage bands are from Sandia’s summary of NOGRR282 [2].

QuantityBandMinimum ride-through
Voltage (RMS, per unit)0.90 to 1.10Continuous
Voltage1.10 to 1.201.0 s
Voltage0.80 to 0.902.0 s
Voltage0.50 to 0.800.5 s
Voltage0.35 to 0.500.25 s
VoltageBelow 0.350.15 s
Frequency (Hz)58.8 to 61.2Continuous
Frequency57.5 to 58.8 and 61.2 to 63.0299 s
Demand recoveryAt least 90% of pre-disturbance demandWithin 2 s
ERCOT ride-through requirements for Large Computational Loads. Frequency and recovery from the Nodal Operating Guide Section 2.6.4 [4]; voltage bands from Sandia’s summary of NOGRR282 [2].

PJM has proposed its own rule for computational loads connected at 100 kV or above that add up to at least 50 MW. Between 0.5 and 0.9 per unit the load may reduce power in proportion to the voltage, but it must bring back at least 90% of its load within two seconds of the voltage recovering, and stay within 10% of normal consumption through frequency disturbances. It would also stop sites switching to backup just because a set number of sags has occurred. New facilities entering PJM’s study process from 1 November 2026 would have to comply, and existing ones would get until November 2027 [5]. PJM planned to file the rule at FERC in November; we have not confirmed the filing.

NERC is setting the national baseline. FERC ordered it on 16 July 2026 to file computational-load standards by 31 December 2026 [6]. The NERC Board adopted the first set (CLO-001-1, CLO-002-1, CLO-003-1 and revisions to FAC-001 and FAC-002) on 26 October 2026, covering loads of 50 MW or more connected at 100 kV or above [7]. These cover interconnection studies, modelling data, operational data and protection. Ride-through is in scope, but the numeric thresholds are later work, expected in 2027.

For a battery engineer the direction is clear. Within a couple of years most large AI sites in North America will need a demonstrated way to ride through a sag and recover within about two seconds, backed by validated models. The site’s general background on codes is in Grid Connection Requirements for BESS, which covers the same idea from the generation side.

Two jobs for one battery

A grid-side battery at an AI campus can be asked to do two quite different things.

  • Ride-through. Hold the site’s supply steady for fractions of a second to a few seconds while the grid voltage is depressed, so that the UPS and transfer schemes have no reason to leave. This is a power job with very little energy in it.
  • Load smoothing. Absorb and supply the fast swings that training jobs create, so the grid sees a flatter profile. The BBU post covers the rack-level part of this; NVIDIA’s guidance for its own sites describes the facility battery as catching what passes through rack-level smoothing, while also coordinating with generators and handling islanded operation [8]. PNNL’s simulation work shows a tuned grid-forming storage system raising the frequency nadir and damping power oscillations from fast load changes [9]. That study did not look at cell ageing.

Add the commercial uses an owner will want (demand response, arbitrage, generator support) and the same state-of-charge window ends up serving several masters. NVIDIA’s point that the controls need explicit priorities to stop uncontrolled SOC drift is the right one [8]. The layering of those decisions is covered in BESS Control Hierarchy: BMS, EMS and SCADA, and the inverter side in Grid-Forming vs. Grid-Following Inverters.

The hardware options

Sandia’s review compared four ways of meeting NOGRR282 at a 100 MW facility [2]. The costs are one laboratory’s one-off estimates, not market prices, but the ranking is useful.

OptionWhat it doesSandia cost estimate, 100 MW site (US$ M)Availability
Grid-interactive UPSFirmware and control changes so the existing UPS rides through deep sags in power-sharing mode and restores demand within 2 s1 to 15Now
Central BESSBattery and inverter at the point of connection, typically a 2 to 4 hour system with full power for 2 hours or more35 to 70Now
Series BESSWhole-site UPS in series with the load; higher conversion losses50 to 901 to 2 years
E-STATCOMSupercapacitor-backed reactive and short active support, seconds only25 to 50Not stated
Options for large-load ride-through, summarised from Sandia National Laboratories’ presentation to ERCOT, September 2026 [2]. The high end of the UPS range includes battery replacement.

Our reading: if ride-through is the only requirement, the cheapest route is to change how the UPS behaves, not to buy a new battery. A central BESS earns its place when it is also doing load smoothing and site services, because then the cost is shared across several jobs. A PJM official quoted by TechTarget said that on-site batteries used only for the facility’s own purposes will not be enough on their own, so the control behaviour has to change either way [5]. For short bursts with very high cycle counts, supercapacitors and hybrid energy storage are worth keeping in the comparison.

A quick sizing check

Take a 100 MW site and the longest voltage band in the table, 0.80 to 0.90 per unit for 2 seconds. Carrying the whole load for that time needs:

E=P×t=100 MW×2 s=200 MJ≈0.056 MWhE = P \times t = 100\ \text{MW} \times 2\ \text{s} = 200\ \text{MJ} \approx 0.056\ \text{MWh}

where E is the energy delivered, P the site power and t the ride-through time. On a 200 MWh central system that is less than 0.03% of capacity. Ride-through is a power, response-time and controls problem. The energy is trivial.

Load smoothing is where the cells start to work. Suppose, purely as an illustration, that the battery supplies 20 MW for 5 seconds each time a swing passes through rack-level smoothing. That is 100 MJ, or about 0.028 MWh, per event. If that happens 10,000 times a day, the daily discharge throughput is:

Eday=N×ΔP×t=10,000×20 MW×5 s≈278 MWhE_{day} = N \times \Delta P \times t = 10{,}000 \times 20\ \text{MW} \times 5\ \text{s} \approx 278\ \text{MWh}

where N is the number of events per day and ΔP the power of each swing. On a 200 MWh system that is about 1.4 full equivalent cycles a day, made up entirely of tiny partial cycles. Each event moves the SOC by about 0.014%, so the cells barely notice it. The warranty almost certainly will, because most BESS warranties count energy throughput or cycles (see BESS Warranties and Performance Guarantees). The event size and count here are our assumptions, not measurements; the point is that small swings add up to real throughput.

What the duty does to the cells

Three features of this duty matter for an LFP storage cell.

  1. High resting SOC. To be ready for ride-through and for swings in both directions, the system sits in a reserved SOC band most of the time, usually well above the middle of the range if discharge support is the priority. Time at high SOC and temperature drives calendar ageing; see How to Minimise Calendar Ageing.
  2. Very shallow, very frequent cycles. Shallow cycling is gentle per cycle, but the count is huge and the throughput is real, as the arithmetic above shows. Standard cycle-life tests at 1C or 0.5C full cycles do not represent it.
  3. Heat with little rest. Continuous small currents mean continuous losses. The rack never gets the long idle periods that let an arbitrage system cool down between cycles.

The evidence on this exact duty is thin. EIP Storage’s chief executive, Ron DiFelice, made the point in November 2026 that there is no independent long-duration data showing one LFP system can both shape load and ride through disturbances [10]. The closest published data we found are Xu et al., who aged eight-cell, 220 Ah LFP modules under peak-shaving and frequency-regulation profiles [11]. They report peak shaving ageing faster, with a decay ratio of 1.81 against frequency regulation at 25 °C and 1.92 at 40 °C. The limits matter here. The profiles averaged 0.5C with 30 minute rests, the test ran 1,000 cycles, the paper does not state replicate counts, and some of its own ratios disagree between the results section and the conclusions (a depth-of-discharge ratio of 1.2 in one place and 1.65 in another). It tells us that duty matters, but not what an AI micro-cycling profile will do. Our earlier review of the same paper is in BESS Ageing vs Duty Cycle.

What to ask a supplier

  1. Cycle-life data at the actual duty: micro-cycle amplitude and frequency, resting SOC, temperature and the rest pattern, not a 1C full-cycle curve.
  2. How the warranty counts micro-cycles: by energy throughput, by an equivalent full cycle count, or by a rainflow-type method, and what the annual throughput cap is.
  3. The reserved SOC band for ride-through, how it is protected from other uses, and what happens when it is breached.
  4. Response time from voltage dip to full power, measured at the point of connection, and grid-forming capability.
  5. Validated electromagnetic transient (EMT) models and the as-built verification tests behind them, since both NERC’s standards and NVIDIA’s own qualification guidance put weight on models that match the hardware [7][8].
  6. Thermal design for continuous low-level current with no long rests.

What to take from this

Ride-through is now a grid rule, not a nice-to-have, starting with ERCOT and moving across North America as PJM and NERC follow. For most sites it is cheapest to solve in the UPS controls. A grid-side battery makes sense when it shares its cost with load smoothing and site services, and then the cell duty becomes high resting SOC plus a very large number of shallow cycles. Nobody has yet published long-term ageing data for that duty, so the supplier’s test profile and the warranty’s throughput clause deserve more attention than the headline cycle number. As NERC sets numeric thresholds in 2027, we expect this to look more like a standard BESS grid-connection exercise, with the battery specified to a defined duty rather than sized by rule of thumb.

References

  1. PJM, Dominion Review Large Load Transfer Event, PJM Inside Lines, 11 August 2026
  2. R. Elliott and M. Reno, Voltage and Frequency Ride-through for Large Computational Loads: State of the Art, Sandia National Laboratories, presentation to ERCOT, September 2026
  3. ERCOT, NOGRR282: Large Computational Load Ride-Through Requirements
  4. ERCOT, Nodal Operating Guide, Section 2.6.4, October 2026
  5. PJM proposes ride-through rules for large data center loads, TechTarget, September 2026
  6. FERC, Order Directing NERC to File Reliability Standard(s) Pertaining to Computational Load Integration, Docket RD26-7-000, 196 FERC 61,031, 16 July 2026
  7. Reliability standards for AI data centers, crypto miners move closer to adoption, Utility Dive, updated 27 October 2026
  8. S. James, H. Petty and S. Somayajula, Designing Production-Ready Battery Energy Storage Systems for AI Factories, NVIDIA Technical Blog, June 2026
  9. B.A. Ross, X. Lyu, U.C. Nwaneto, S. Mohiuddin and A.B. Nassif, Using Grid-Forming Energy Storage Systems to Provide Dynamic Active Power Support, IEEE Access 14 (2026) 29250 to 29259
  10. BESS Industry Buzz: CATL sodium-ion specs, BESS availability and the price of speed-to-power, Energy-Storage.news, November 2026
  11. J. Xu, H. Li, S. Hua and H. Wang, Experimental investigation of grid storage modes effect on aging of LiFePO4 battery modules, Frontiers in Energy Research 13:1528691 (2025)

See also: Batteries for AI Data Centres: BBU vs UPS, Battery Energy Storage Systems, Grid Connection Requirements for BESS, Grid-Forming vs. Grid-Following Inverters, BESS Ageing vs Duty Cycle, Grid BESS Duration Classes, IEEE 1547