Every HV system has to stay isolated from the vehicle chassis, and the regulations set the floor as a resistance per volt of working voltage. This calculator turns that into numbers in three steps: the minimum resistance for your bus, a check that the component allocations still meet it once they are all connected, and the voltmeter method that turns three measured voltages into an isolation resistance. It works alongside our Isolation Resistance of a Pack post, which covers the requirements and measurement in detail, and HV Isolation & Ground Fault Monitoring, which covers the on-board monitor.

HV Isolation Resistance Calculator
Three steps: the minimum isolation resistance for your bus, a check that the component allocations add up, and the UN R100 / FMVSS 305 voltmeter method for turning measured voltages into a resistance.
1. Requirement
2. System allocation
Every component on the HV bus is in parallel to chassis, so the system value is always lower than the lowest component. Leave a box blank if it is not used.
3. Measurement (voltmeter method)
Use a DC voltmeter with an internal resistance of at least 10 MΩ. Measure Vb, V1 (negative to chassis) and V2 (positive to chassis). Fit R0 across whichever side reads higher, then measure that side again.
Limits are from UN Regulation No. 100 (paragraph 5.1.3) and FMVSS 305. The third bus option applies only when every AC part meets the extra protection conditions in the regulation, for example double insulation or mechanically robust enclosures. Leakage current at the limit is our arithmetic: the working voltage divided by the minimum resistance. This tool is an aid, not a compliance record. Check the current edition of the regulations that apply to your market.
The Requirement
UN Regulation No. 100 sets a minimum of 100 Ω/V of working voltage for DC buses and 500 Ω/V for AC buses [1]. Where AC and DC buses are galvanically connected, the 500 Ω/V figure applies to the whole system, unless every AC part has the extra protection the regulation lists, in which case 100 Ω/V is enough. FMVSS 305 in the US uses the same two figures [2]. The DC limit is lower because direct current has less physiological effect than alternating current [3].
where k is the requirement in Ω/V and Vw is the maximum working voltage. For an 800 V system on the 500 Ω/V rule that is 400 kΩ. A useful way to read the per-volt figure: the current that can flow through the isolation path at the limit is Vw / Ri,min = 1 / k. That is 10 mA at 100 Ω/V and 2 mA at 500 Ω/V, whatever the system voltage (our arithmetic).
Allocating Across Components
Every component on the HV bus sees chassis through its own isolation resistance, and these all act in parallel:
The default values in the calculator show why this matters. A 1.5 MΩ pack, two 2 MΩ components and two 3 MΩ components each look comfortable against a 400 kΩ requirement, yet together they come to 429 kΩ, only 7% above the 800 V limit (our arithmetic on illustrative values). The system engineer has to give each component a target well above the system figure, and the battery is only one of several items sharing the budget. For a sense of real targets, the published Tesla and VW ID.4 values are listed in our Isolation Resistance of a Pack post.
The Voltmeter Method
The isolation measurement annex of R100 and S7.6 of FMVSS 305 describe the same measurement [1][2]. With a DC voltmeter of at least 10 MΩ internal resistance, measure the pack voltage Vb, the negative pole to chassis V1 and the positive pole to chassis V2. Fit a known resistor R0 from the higher-reading pole to chassis and measure that pole again. If V1 ≥ V2:
and if V2 > V1, the same expression with V2 and V2′. The result is the resistance on the opposite side to R0, which is always the lower of the two, so it is the one that matters. If the isolation on each side is modelled as a single resistor, the expression follows directly from the two voltage-divider readings: the terms in the negative-side resistance cancel and only the positive-side resistance is left (our derivation). The equation holds for any R0, but a value close to the required resistance, within ±20%, gives a good change in reading. The calculator suggests that range in step 1.
Two checks are built in. If V1 + V2 comes out noticeably more than Vb, something is wrong with the meter or the connections. If the reading with R0 fitted does not fall, the resistor is on the wrong pole or not connected.
This is an aid for design and bench checks, not a compliance record. Check the current edition of each regulation for your market, and the conditions it attaches to the 100 Ω/V option for combined AC and DC buses.
References
- UN Regulation No. 100, Uniform provisions concerning the approval of vehicles with regard to specific requirements for the electric power train, paragraph 5.1.3 and the isolation resistance measurement annex, as published in the Official Journal of the EU, 2021/2190. EUR-Lex
- 49 CFR 571.305, FMVSS No. 305 Electric-powered vehicles: electrolyte spillage and electrical shock protection, S5.4.3 and S7.6. Cornell LII
- NHTSA, FMVSS No. 305 final rule, Federal Register Vol. 82, No. 186, 27 September 2017. GovInfo
See also: Isolation Resistance of a Pack, HV Isolation & Ground Fault Monitoring, Creepage and Clearance Calculator, Pre-Charge Resistor, Battery Calculators